EcoService OS

RTU First Start-up Sequence

EPA 608 practice · Type IINATE-style practice · Basic electrical

New packaged RTU has been set on the curb. Electrical and duct connections are complete. You are called to perform first start-up and basic verification before handover. Unit: 6-ton gas/electric packaged RTU, R-410A, economizer equipped, newly installed. This is a graded decision lab from Installation, Start-up & Commissioning — you choose each next check, readings fill in as you work, wrong turns are coached, and you are scored on cause, efficiency, safety and verification. It runs inside HVAC Technical Training — Paths A–D, about 14 minutes.

  • Interactive decision labs
  • Built by working technicians
  • Path-based verifiable certificate
  • Exam preparation only
  • Worldwide online

Loading the lab…

Where this lab sits

This is one module lab from Installation, Start-up & Commissioning. The full path builds the rest of the diagnostic sequence around it, each module ending in a graded lab like this one.

Studying for an exam too?

Free practice questions with explained answers, then come back to the labs. Exam preparation only — we do not issue EPA, NATE or other official credentials.

All diagnostic labs